FAA Repair Station AAFR278E · Miami, FL

Piston aircraft magnetos, overhauled to release.

A Part 145 certificated repair station in Miami. Every magneto we touch carries one work order number from the receiving bench to FAA Form 8130-3 — with every inspection, every part, and every signature attached to it.

Certificate
AAFR278EFAA Part 145 Repair Station
Release
8130-3Airworthiness approval tag
Overhaul TAT
3–5 DaysStandard turnaround
Call
(954) 471-5005Miami, Florida
What We Do

Magnetos are all we do — and that is the point.

A magneto is the ignition system of a piston engine. When it fails, the aircraft does not fly. We route every unit to the scope it actually needs, quote it before we consume a single part, and release it on the form the FAA expects to see.

01 · FULL SCOPE

Overhaul

Complete teardown, cleaning, component-level inspection, replacement of every life-limited item to the manufacturer's kit, reassembly to recorded torque, and full test. Three to five days.

02 · TARGETED

Repair

Correction of a specific known discrepancy without a full overhaul cycle. The unit is opened only as far as the repair requires, and findings are quoted before we proceed.

03 · FASTEST

Bench Test

Performance verification with recorded results, no teardown, one-day turnaround. The right first step when you need to know whether a unit is serviceable.

04 · FIND OUT FIRST

Inspection & IRAN

Inspect and repair as necessary. We open the unit, report what we find with our recommendation — then wait. Nothing is consumed until you approve a scope and a price.

05 · SCHEDULED

500-Hour Inspection

Scheduled inspection to the manufacturer's 500-hour kit, with contact assembly and wear items addressed and results recorded against the unit's serial number.

06 · DOCUMENTATION

Recertification

Return an in-date unit to service with current documentation, a verified airworthiness directive and service bulletin review, and a fresh airworthiness release.

Process

One work order number holds the entire history.

Every unit runs this path. Reduced scopes skip stages that do not apply — a bench test does not get torn down — but no unit skips a stage to save time.

STAGE 01

Incoming

Recorded by part and serial number, arrival condition and anything missing. Receiver signs; work order number issued.

STAGE 02

Teardown

Disassembly and cleaning, signed at each station, components routed for individual evaluation.

STAGE 03

Inspection

Every listed component examined and recorded pass or fail, watching for the hidden damage a visual check misses.

STAGE 04

Quote

Findings drive a bill of materials and a price. Nothing is consumed until you approve the scope.

STAGE 05

NDT / FPI

Penetrant inspection by an approved outside vendor under ASTM E1417. No part proceeds to paint, assembly or installation while its status is unresolved.

STAGE 06

Parts

Reserved against the work order with lot, serial and certification trace. Shortages become a recorded status, not a silent delay.

STAGE 07

Assembly & Test

Torque recorded against the calibrated tool used, then bench and final test. Failures loop back through rework.

STAGE 08

Release

8130-3 generates from controlled fields only after every discrepancy closes. An authorized person signs Block 14.

Why stage 05 is boxed: it is the one gate that stops everything. A pending, rejected or undocumented penetrant inspection result holds the unit where it stands — not as a matter of discipline, but because the unit does not leave the hold. This is the single control that most distinguishes a defensible repair station record from a hopeful one.

Units Serviced

Champion Slick and Continental magnetos.

We work to current manufacturer technical data and record the manual revision in use against every work order, so no unit is ever worked to superseded instructions.

Magneto models, matching kits and standard turnaround
MagnetoManufacturerPart NumberOverhaul Kit500-Hour KitStandard TAT
Slick 4371Champion AerospaceMK 401MK 4313–5 days
Slick 4370Champion AerospaceMK 402MK 4313–5 days
Dual Magneto 10-682910-18Continental10-682910-18MK 601MK 6313–5 days
S6LSC-204TContinental10-600646-201By modelBy model3–5 days

Don't see your unit? Model coverage changes as technical data and tooling are added. Call (954) 471-5005 or send the part number and serial number and we'll confirm whether it's within our rating before you ship. New to magneto overhaul? Start with our owner's guide.

Quality & Compliance

Built for the audit, not just the invoice.

Any shop can tell you it is FAA certificated. These are the specific controls that make the certificate mean something.

  • AD & Service Bulletin Review

    Applicability checked and recorded before release, reflected in the remarks block of the 8130-3.

  • Approved Vendor Control

    External NDT issued only to a vendor approved for that scope, with the method cited on the repair order.

  • Serialized Traceability

    Units tracked by serial number, parts by lot or serial, certification trace retained throughout.

  • Calibrated Tooling

    Torque recorded against the specific tool used, calibration status verified at the point of use.

  • Current Technical Data

    Manual and revision recorded on the work order, so no unit is worked to superseded instructions.

  • Controlled Release Authority

    Block 14 signed only by personnel on the release roster, under the repair station certificate number.

Common Questions

What operators ask us.

How is an overhaul different from a repair?
A repair corrects a specific known discrepancy. An overhaul is a complete scope: full teardown, evaluation of every component against manufacturer limits, and replacement of every item the overhaul kit calls for regardless of its apparent condition.
Do you perform fluorescent penetrant inspection in-house?
No, and we say so plainly. FPI is performed by an approved outside vendor under the ASTM E1417 family method, and accepted or rejected by an authorized inspector before the part moves on.
Will you tell me the cost before you start?
Yes. Inspection findings drive a parts list and a price, and that goes to you for approval. No part is issued against your unit and no repair begins until you approve the scope.
How long does an overhaul take?
Three to five business days from approved quote, plus roughly two days if external penetrant inspection is required. That NDT window is disclosed at quote time.
What paperwork comes back with my magneto?
FAA Form 8130-3, identifying the unit by part and serial number, stating the work performed, citing the technical data revision used, and signed in Block 14 under our repair station certificate.

Read the full overhaul guide

Contact

Send us the part number. We'll tell you what it needs.

Give us the model, part number and serial number of your unit and what you are seeing. We'll confirm it's within our rating and come back with a scope and a price before anything ships.

Shipping & Receiving
14250 SW 136th St, Ste 10
Miami, FL 33186
Repair Station Certificate
AAFR278E
Hours
Monday–Friday
9:00 AM – 5:00 PM ET

Request a quote

We reply with rating confirmation, scope and price.

Your request goes straight to our quoting desk. We reply with rating confirmation, scope and price — usually within one business day.

Ready when your unit is.

Model, part number, serial number and a note on the symptom is all we need to start.

CallRequest a Quote